Abstract

In this paper, we study permutation flowshop problems with minimal and/or maximal time lags, where the time lags are defined between couples of successive operations of jobs. Such constraints may be used to model various industrial situations, for instance the production of perishable products. We present theoretical results concerning two-machine cases, we prove that the two-machine permutation flowshop with constant maximal time lags is strongly NP-hard. We develop an optimal branch and bound procedure to solve the m -machine permutation flowshop problem with minimal and maximal time lags. We test several lower bounds and heuristics providing upper bounds on different classes of benchmarks, and we carry out a performance analysis.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.