Abstract

A live line measurement method for the zero sequence parameters of transmission lines with mutual inductance is introduced. The mathematical models of the measurement method are given. Global Positioning System (GPS) is used as the synchronous signal for the measurement carried out at different substations simultaneously. The measurement system and digital simulation results are given. Finally, the live line measurement results of two 220 kV transmission lines with mutual inductance in Hainangrid are given. Results from both simulation and on-site measurement show that the live line measurement method is feasible, and its measurement accuracy can satisfactorily meet the requirements of engineering measurement.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.