Abstract

A precise measurement method for positive sequence parameters of EHV and UHV AC transmission lines is proposed. The mathematical models are presented in detail. Global Positioning System (GPS) is used as the synchronous signal for the measurement carried out at different substations simultaneously. The measurement device and digital simulation results are given. Finally, the measurement results of two 500 kV AC transmission lines are given and compared with the measured results by traditional method. Results from both simulation and on-site measurement show that the proposed measurement method is feasible, and its measurement accuracy can satisfactorily meet the requirements of engineering measurement.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.