Abstract

In this paper, the RCPSP (resource constrained project scheduling problem) is solved using a linear programming model. Each activity may or may not be preemptive. Each variable is associated to a subset of independent activities (antichains). The properties of the model are first investigated. In particular, conditions are given that allow a solution of the linear program to be a feasible schedule. From these properties, an algorithm based on neighbourhood search is derived. One neighbour solution is obtained through one Simplex pivoting, if this pivoting preserves feasibility. Methods to get out of local minima are provided. The solving methods are tested on the PSPLIB instances in a preemptive setting and prove efficient. They are used when preemption is forbidden with less success, and this difference is discussed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.