Abstract

This paper is about the Resource-Constrained Project Scheduling Problem) RCPSP) which is one of the most important problems in last three decades and many researchers have paid attention to it and have reached useful results. In this paper, to cope with uncertainty issue, the RCPSP is studied under fuzzy environment where activity times are assumed to be fuzzy numbers. For this problem with fuzzy numbers as activity times, a linear mathematical programming model is presented. The objective function of the model is minimizing the completion time of project. Since the activity times are fuzzy numbers, finish time is also a fuzzy number. Hence, the model is transformed to a crisp multi-objective linear programming model. To illustrate the solution method, a numerical example is solved under both fuzzy and crisp environment and the results are compared. To prove the efficiency of the proposed method the results of the proposed solution method, some benchmark problems obtained from PSPLIB are utilized.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.