Abstract

Jilin City is one of the top ten famous Chinese cities worth introducing to the world. To further improve the construction of urban infrastructure and meet the needs of the economic and social development of Jilin City, the Jilin City Government Joint Development and Reform Commission and the Ecological Environment Bureau decided to expand and renovate the former Jilin City wastewater treatment plant. This study designs a wastewater treatment plant by comprehensively considering the policy needs and the local basic background characteristics of Jilin to solve the wastewater overflow problem. The design modified the anaerobic tank and Carroussel oxidation ditch processes, which have more advantages than traditional treatment processes, mainly including better BOD, nitrogen and phosphorus removal efficiency, less power consumption, and lower operating costs. This treatment plant design contains two special characteristics: the design considers the overall plan and pipeline layout of the wastewater treatment plant, and the size data of each module are calculated through theoretical study conforming to the real case.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call