Abstract

SummaryLiquid loading in low-production gas wells is a common problem faced in many producing regions around the world. The techniques available to remove liquids from the wellbore impose significant capital and operational costs. This study investigates a new method for unloading and restoring continuous production of low-rate (i.e., stripper) gas wells. The performance of a patented vortex-flow-modifier tool was examined using a 125-ft vertical-flow loop of 2-in.-diameter clear PVC pipe. The vortex device was found to alter the basic flow structure in the pipe, resulting in improved liquid flow. The tool was observed to reduce tubing-pressure loss by up to 17% and lower the minimum gas velocity required to lift liquids up the tubing string.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.