Abstract
Precast concrete deck bulb-tee girder systems offer an excellent choice for prestressed concrete bridges with spans of 100 ft (30.48 m) or more. These girders are placed side by side in the field and connected using longitudinal joints. The wide top flange of the girders acts as a deck, eliminating the need for a cast-in-place concrete deck and providing a solution for accelerated bridge construction. However, the longitudinal joints between the girders often crack under service loads, allowing for water and deicing chemicals to enter the system and cause corrosion. An analytical study with ultra-high-performance concrete (UHPC) longitudinal joints was performed to investigate the joint performance when subjected to thermal and live loads. A continuity diaphragm with UHPC in the top flange was also investigated for negative moment over pier. Results of the investigation suggest that the use of UHPC can improve the performance of the connections. The high bond strength of the UHPC reduces the connection length and allows for simpler reinforcement details.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.