Abstract

Yangzhuang sluice is located on the Gaoyou Lake control line of the Huaihe River into the Yangtze river and was built in May 1970. Due to the inherent insufficient design and historical reasons, Management Office has been using manual operation scheduling management of the sluice gate. The safety risks are large and the scheduling accuracy is not high. In order to further improve the comprehensive scheduling performance of sluice andenhance the scientific level of scheduling management, establish automatic control system, automatic control to realize power distribution system and gate, meet the requirements of “unattended, less people on duty”, and build sluice management system based on the Internet of Things system, realize the automatic monitoring and management of sluice, which is also the development demand of modern water conservancy.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call