Abstract

ABSTRACT This paper presents the electrical performance of organic photovoltaic modules (OPVs) on top of a polyethylene covered greenhouse high tunnel in a Mediterranean climate. Modules from a previous study were kept on the tunnel and monitored together with new modules with improved connectors installed on the greenhouse roof and on frames adjacent to the greenhouse. Measured module power conversion efficiencies ranged from 1% to 3%. The typical combined output of the modules across the tunnel roof were 105Wh on a sunny day and 81Wh on a cloudy day. Module burn-in period was about 15 days, losing around 36% of its initial efficiency. Ts80 lifetimes ranged from 7 days to 94 days. Tunnel integration was shown to accelerate module degradation.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.