Abstract

This paper deals with the problem of integrating noncyclical preventive maintenance and tactical production planning for a single machine. We are given a set of products that must be produced in lots during a specified finite planning horizon. The maintenance policy suggests possible preventive replacements at the beginning of each production planning period, and minimal repair at machine failure. The proposed model determines simultaneously the optimal production plan and the instants of preventive maintenance actions. The objective is to minimize the sum of preventive and corrective maintenance costs, setup costs, holding costs, backorder costs and production costs, while satisfying the demand for all products over the entire horizon. The problem is solved by comparing the results of several multi-product capacitated lot-sizing problems. The value of the integration and that of using noncyclical preventive maintenance when the demand varies from one period to another are illustrated through a numerical example and validated by a design of experiment. The later has shown that the integration of maintenance and production planning can reduce the total maintenance and production cost and the removal of periodicity constraint is directly affected by the demand fluctuation and can also reduce the total maintenance and production cost.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.