Abstract

In this paper, we propose to generalize the model of the integration of noncyclical preventive maintenance scheduling and production planning from a single machine to a series-parallel production line. As in the case of a single machine, we consider, a set of products that must be produced in lots during a given horizon. As maintenance strategy, we consider the possibility of preventive remplacements at the beginning of each period (maintenance period), and minimal repair at machine failure. The model addressed determines the optimal production plan and preventive remplacement for each component of the series-parallel production line. The objective is to minimize the total cost consisting of preventive and corrective maintenance costs, setup costs, holding costs, backorder and production costs, while meeting the demand of each product over the entire horizon.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.