Abstract
We consider a scheduling problem where a set of jobs are first processed on a machine with an unavailability interval and, then, delivered to the customer directly. We focus on an integrated schedule of production and distribution such that the sum of the maximum delivery time and total delivery cost is optimized. We study two classes of processing machines in the production part. In the first class, the serial-batch machine, the processing time of a batch is the sum of the processing times of its jobs. In the second class, the parallel-batch machine, the processing time of a batch is the maximum processing time of the jobs contained in the batch. The machine has a fixed capacity, and the jobs are processed in batches under the condition that the total size of the jobs in a batch cannot exceed the machine capacity. Two patterns of job’s processing, i.e., resumable and non-resumable, are considered if it is interrupted by the unavailability interval on the machine. In the distribution part, there are sufficient vehicles with a fixed capacity to deliver the completed jobs. The total size of the completed jobs in one delivery cannot exceed the vehicle capacity. We show that these four problems are NP-hard in the strong sense in which the jobs have the same processing times and arbitrary sizes, and we propose an approximation algorithm for solving these four problems. Moreover, we show that the performance ratio of the algorithm is 2 for the serial-batch machine setting, and the error bound is 71/99 for the parallel-batch machine setting. We also evaluate the performance of the approximation algorithm by the computational results.
Highlights
Joint consideration of production and distribution is so beneficial in making higher level decisions for the manufacturers in the realistic supply chain environment that many researchers kept on studying on various models of such integrated scheduling problems
E approximation algorithm and the branch-andbound algorithm are coded in VC++, and the computational experiments are run on a personal computer
We consider four integrated scheduling problems to minimize the sum of the maximum delivery time and the total delivery cost, in which a set of jobs are first processed on a single batch machine with an unavailability interval and, delivered to the customer directly, and the jobs have the same processing time and arbitrary sizes
Summary
Joint consideration of production and distribution is so beneficial in making higher level decisions for the manufacturers in the realistic supply chain environment that many researchers kept on studying on various models of such integrated scheduling problems. Potts [1] was probably the first researcher who considered scheduling with job delivery. Hall and Potts [2] studied integrated scheduling that involves a supplier, a manufacturer, and a customer. There are an increasing number of literature and a variety of new models on scheduling problems with job delivery. Chen [4] and Wang et al [5] have surveyed the integrated scheduling problems of production and distribution operation