Abstract

AbstractEngineering, Procurement, Construction and Installation (EPCI) projects for the offshore oil and gas industry become more and more complex, with a reduced timeframe, and increased demand for cost savings in the industry. The result is reduced profit margins; therefore, the need for increased productivity is higher than ever. Some of the aspects important for productivity include material flow, information flow, sound planning, and organizational structure. This paper focuses on the information transfer between the engineering team and the installation phase of the fabrication at AS Nymo. Feedback from stakeholders, previous research and lessons learned from completed projects pinpoints that this handover has a potential for improvement. We analyzed historical data and involved key stakeholders in an iterative process to identify insignificant elements in the handover format. By removing this insignificant information, we found that it is possible to reduce the number of handover revisions by 60%. Additionally, we found that improving the handover could give a 67% reduction in time spent for the receiving stakeholders to find the specific information they seek. To verify our results, we suggest further testing for verification before validation through a full‐scale project execution testing for future research.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.