Abstract

The problems of utilization of construction waste during the reconstruction of buildings and structures are considered. The methodological approaches to the processing of construction waste are studied, including the recycling of products of processing of concrete and reinforced concrete, which is currently one of the most priority areas of business in the construction industry. As a possible project, a mini-plant was chosen - a crushing and screening complex DSK-48-13, offered by the Obukhov Scientific and Industrial Company of the city of Nizhny Novgorod. An analysis of the project for the construction of a mini-plant for the processing of construction waste DSK-48-13 in the Samara region was carried out. The rationality of using the products of processing of concrete and reinforced concrete is substantiated.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.