Abstract
The paper presents the conceptual solution on the basis of which a system for continuous monitoring and control of auxiliary power consumption is defined in the four most important thermal power plants within the Electric Power Industry of Serbia (TENT A and B, TE Kostolac A and B). A unique system of measuring of auxiliary power consumption at the level of EPS is established in order to perform the appropriate measurement in the following phases, whose data would be archived for the purpose of further analyzes of energy balances. The results of these measurements should be used to define the concrete measures for auxiliary power consumption reduction in power plants, which, in addition to improving energy efficiency, would directly affect the cost reduction.
Published Version (Free)
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Zbornik radova, Elektrotehnicki institut Nikola Tesla
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.