Abstract

To increase the supply of electricity and reduce environmental pollution, China has made an effort to boost the renewable energy. As a renewable energy, wind energy has been maintaining a rapid growth over the last ten years. China has the largest construction market for wind power in the world, so it attracts many local and foreign investors. However, because of the lack of a full understanding of China's complicated administrative procedure for wind power projects, many foreign investors have encountered difficulties when trying to enter the Chinese wind power market. According to the relevant laws, regulations, policies and project practices, this paper puts forward a main management procedure model for Chinese wind power projects as well as four subdivided process models, including the Project Approval Process, the Land Application Process, the Design Process and the Licensing and Construction Process. And then the administrative requirements, milestones and main points of works are identified and analyzed within the framework of the four processes. The results open a window through which both the local and foreign investors can perceive a panoramic procedure for wind power project construction in China.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.