Abstract
In anticipation of an Electron Cyclotron Resonance Heating system upgrade for the stellarator Wendelstein 7-X, a 1.5 MW - 140 GHz continuous-wave gyrotron is under development. In order to provide a first experimental verification of the scientific RF and electron beam optics design of the gyrotron with ms pulses, the Karlsruhe Intitule of Technology has developed a short-pulse pre-prototype gyrotron. In this work, we present details regarding the construction of the pre-prototype as well as measurements from the first experimental campaign delivering up to 1.6 MW in short pulses.
Accepted Version (Free)
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have