Abstract

Design, development, manufacturing, and test activities of the RF power system (RFPS) for Linear IFMIF Prototype Accelerator (LIPAc) were completed in Europe. Installation and commissioning activities were carried out at the International Fusion Materials Irradiation Facility-Engineering Validation and Engineering Design Activities (IFMIF/EVEDA) site in Rokkasho, Japan. Challenging IFMIF requirements led to a number of innovations during design and development. Commissioning required a major effort on calibration and fine setting and led to development of new functionalities. The RFPS was validated under full power and 125-mA deuteron beam loading conditions, in the radio frequency quadrupole (RFQ), demonstrating good performance. This article is an overview about how technical challenges impacted the prototype RFPS design and its functional evolution during commissioning, cavity conditioning, and beam operation of the RFQ.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call