Abstract

Design, development, manufacturing, and test activities of the RF power system (RFPS) for Linear IFMIF Prototype Accelerator (LIPAc) were completed in Europe. Installation and commissioning activities were carried out at the International Fusion Materials Irradiation Facility-Engineering Validation and Engineering Design Activities (IFMIF/EVEDA) site in Rokkasho, Japan. Challenging IFMIF requirements led to a number of innovations during design and development. Commissioning required a major effort on calibration and fine setting and led to development of new functionalities. The RFPS was validated under full power and 125-mA deuteron beam loading conditions, in the radio frequency quadrupole (RFQ), demonstrating good performance. This article is an overview about how technical challenges impacted the prototype RFPS design and its functional evolution during commissioning, cavity conditioning, and beam operation of the RFQ.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.