Abstract

In the framework of the IFMIF-EVEDA project (International Fusion Materials Irradiation Facility-Engineering Validation and Engineering Design Activities), CEA∕IRFU is in charge of the design, construction, and characterization of the 140 mA continuous deuteron injector, including the source and the low energy beam line. The electron cyclotron resonance ion source which operates at 2.45 GHz is associated with a 4-electrode extraction system in order to minimize beam divergence at the source exit. Krypton gas injection is foreseen in the 2-solenoid low energy beam line. Such Kr injection will allow reaching a high level of space charge compensation in order to improve the beam matching at the radio frequency quadrupole (RFQ) entrance. The injector construction is now completed on the Saclay site and the first plasma and beam production has been produced in May 2011. This installation will be tested with proton and deuteron beams either in pulsed or continuous mode at Saclay before shipping to Japan. In this paper, after a brief description of the installation, the preliminary results obtained with hydrogen gas injection into the plasma chamber will be reported.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.