The Radio Frequency Quadrupole (RFQ) linac and 1.6 MW RF power system of the Linear IFMIF Prototype Accelerator (LIPAc) facility in the International Fusion Energy Research Center (IFERC) in Rokkasho (Japan) has been installed and conditioned. During the assembly and tuning process, the RFQ cavity was protected with a temporary tent from the potential deterioration of performance caused by dust. The vacuum in the cavity was improved through the 100 °C baking process of the cavity. The high power test of the 175 MHz RF systems up to 200 kW in CW for each of the eight RF chains was performed for checking its stable output reproducibility in Japan, before connecting 9–3/16 inch coaxial transmission lines from the RF chains to the RF input couplers of the cavity. It was confirmed that the eight RF chains provided the balanced RF power to the single RFQ cavity in-phase using a feedback loop and a synchronization system. The peak power in the cavity achieved 150 kW in the pulsed mode, which corresponds approximately to the required electric field to accelerate proton beam. Such RF conditioning process is ongoing to achieve 600 kW approximately required for deuteron beam commissioning planned in 2018.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.