Abstract

Seawater desalination is one of the most essential strategies to solve freshwater shortage issues worldwide. Though having the possibility of providing abundant freshwater resources, desalination projects are also limited by the pressure of freshwater consumption. Based on the systems process analysis, the freshwater cost of seawater desalination is assessed with the case study of a 25,000 tons/day seawater desalination plant in Huanghua Port, Hebei Province, China. The total embodied water consumption is 9.02E+06 m3, which is estimated in magnitude as five percent of the total freshwater production in the design cycle. Among all the sub-projects, the embodied water consumption in the technology system engineering represents the largest component, accounting for 60.12% of the total. The productivity level of the project is calculated to be 19.29, which highlights the potential of the desalination project for alleviating the shortage of freshwater. It is necessary to notice that the water yield of the project is calculated to be 9.12E+06 m3, which could achieve the freshwater balance of the construction phase in the first year of operation. The comprehensive inventory and procedure of the embodied water accounting in this work are expected to provide useful references for rational allocation of water resources and optimal design for other desalination projects.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.