Abstract

This paper explores the construction of a nuclear power facility at Fessenheim, Alsace, and its role in the remaking of French-German post-war relations and the consolidation of the post-war peacebuilding process. The siting and materiality of nuclear energy technology, I argue, was a key component of the top-down peace-building strategy that guided reconciliation processes at the national and regional levels. This study analyses archival documents, newspapers articles, interviews with Alsatian antinuclear activists and amateur films in order to reconstruct how the site for a joint nuclear power plant at Fessenheim was chosen and how it affected cross-border interactions. Although the planning of a French-German nuclear facility at Fessenheim embodied the appeasement that characterised post-war relations at a governmental level between the two nations, its construction had limited impact on the regional reconciliation processes. However, the site of the nuclear plant became central for reconciliation in ways that industry planners did not foresee: opposition to the nuclearization of the Upper Rhine Valley became the driving force for the cross-border reconciliation process. This grassroots mobilisation against the presence of nuclear technology formed the nexus for transcending the legacy of World War II through cooperation toward a common, anti-nuclear future.

Highlights

  • This paper explores the construction of a nuclear power facility at Fessenheim, Alsace, and its role in the remaking of French-German post-war relations and the consolidation of the post-war peacebuilding process

  • Would grassroots opposition help transcend the legacy of World War II? Would the siting of a nuclear power plant— through the agency of both its proponents and its opponents—turn cross-border animosity into solidarity?

  • I present the international and transnational politics that enabled the planning of a French-German nuclear power plant at Fessenheim and examine whether this top-down peacebuilding project affected national political collectives and cross-border communities

Read more

Summary

Introduction

This paper explores the construction of a nuclear power facility at Fessenheim, Alsace, and its role in the remaking of French-German post-war relations and the consolidation of the post-war peacebuilding process. The subsequent mobilisation against the construction of the nuclear power plant at Fessenheim, and other similar industrial initiatives in the region, involved people from both sides of the Rhine.

Results
Conclusion

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.