In France, Fire Safety regulations are essentially prescriptive. Their main safety objective is to preserve life, through the complete evacuation of occupants. The construction solutions that fulfill the regulatory corpus prescriptions are deemed to satisfy the safety objectives. For external thermal insulation systems – installed on concrete or masonry walls – other systems than those deemed satisfactory may be implemented. Chapter 5.3 of Technical Instruction n◦249 (IT249, appendix of the Order dated 2010/05/24 [1]) gives details on the conditions of application. The methodology to be implemented shall provide evidence that the studied construction solutions do not worsen the conditions for fire spread, when compared with a solution that is deemed satisfactory, described in the previous chapters of IT249, and taken as a reference point. With the growing pressure of environmental problems, the current trend is to increase buildings insulation in order to reduce energy waste. Concerning external thermal insulation, this trend leads to an increase of the insulation thickness, up to values exceeding those deemed satisfactory in terms of fire safety and described in the regulation. In this case, the methodology to be implemented comes to bring demonstration that for a given insulating product or a given insulating product family, increasing the thickness up to the maximal thickness considered in the study (alternative configurations) does not worsen the conditions for fire spread. The reference configuration is then the same insulating product or family of products, installed with a thickness that complies with regulation requirements. The methodology proposed in this paper rely on theoretical aspects for fire spread on a vertical wall [2, 3], as well as tests at several scales (small, intermediate and full scale) and numerical simulations. It applies to an insulating product or a family of insulating products. In the latter case however, it should be determined which insulating product is representative of the family, that is to say having the worst performance in terms of fire spread. The main principle of this methodology is based on the fact that for insulating products, thermal stimulation from a facade fire progresses slowly in the depth of the material. Thus, as long as this thermal wave has not propagated deep enough to be influenced by any difference in thickness, fire behaviour is necessarily the same for equal stimulations. As a result, during this time for penetration of the thermal wave, any divergence of fire behaviour may only come from differences in the singularities between the reference configuration and the alternative configurations. Therefore, the different experimental scales are intended to: • characterize the insulating material or its family in terms of fire behaviour at small scale (temperature for 5% mass loss through TGA measurement, ignition temperature, critical heat flux through cone calorimeter [4] measurements [5], etc.). This step also gives input data required by calculations and numerical simulations within the study framework; • characterize the insulating material or its family at an intermediate scale (Euroclass) [6]; • explore the behaviour of the singularities of the construction solution at an intermediate scale. The chosen test reproduces a local impact of fire on a bay frame. The test bench is the NF EN 13823 [7] calorimeter;
Highlights
Concerning external thermal insulation, this trend leads to an increase of the insulation thickness, up to values exceeding those deemed satisfactory in terms of fire safety and described in the regulation
The methodology proposed in this paper rely on theoretical aspects for fire spread on a vertical wall [2, 3], as well as tests at several scales and numerical simulations
As a result, during this time for penetration of the thermal wave, any divergence of fire behaviour may only come from differences in the singularities between the reference configuration and the alternative configurations
Summary
For external thermal insulation systems – installed on concrete or masonry walls – other systems than those deemed satisfactory may be implemented. The methodology to be implemented shall provide evidence that the studied construction solutions do not worsen the conditions for fire spread, when compared with a solution that is deemed satisfactory, described in the previous chapters of IT249, and taken as a reference point. Concerning external thermal insulation, this trend leads to an increase of the insulation thickness, up to values exceeding those deemed satisfactory in terms of fire safety and described in the regulation.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.