Abstract

Kori Unit 1 was permanently shut down on June 18, 2017. Since then, Korea is actively preparing for the decommissioning of the nuclear power plant. Because decommissioning work is performed in a radioactive environment, worker radiation exposure is a significant consideration. In this study, worker radiation exposure is evaluated during the steam generator, one of the heavy components of nuclear power plant, dismantling process. A radiation evaluation for the dismantling process is performed using the code RESRAD-BUILD. A steam generator dismantling scenario and optimal cutting method are designed to evaluate worker radiation exposure, considering pipe dimensions, cutting tool speed, and experience in steam generator replacement. The evaluation results are derived for each work type and year. As a result of the evaluation, worker radiation exposure is 7.5 man-mSv at the year of planned decommissioning.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.