Abstract

Data from the Environmental Health Risk Assessment (EHRA) study in 2012 stated that 52% of inundation in Banjarmasin City was caused by a problematic drainage system, the causes of which included siltation of the canals and the large number of weeds growing around the drainage canals, which would interfere with the function of the drainage canals. The data used are road canal cross-sectional dimensions, topographical data, canal alignment data, and land use data in North Banjarmasin Sub District. The calculation analysis method uses the Mononobe method. The results of these calculations will later be used for modeling which are indicated to exceed the water capacity, of course also by adding topographical parameters, land use, and canal alignment. Meanwhile, the planned discharge data from the results of the calculated rainfall and the measuring data of the channel cross-sectional dimensions are used for detailed modeling of the channel cross-section using HecRas. The condition of drainage channels is over-capacity, influenced by the presence of several channels covered with bushes and concrete, the amount of sediment that has not been dredged, the absence of an adequate catchment area system due to the characteristics of the soil in the form of peat soil.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.