Abstract

The issues of ensuring the reliability of automated electric spark testing of the continuity of dielectric coatings on metal pipes with diameters up to 1.5 meters in the context of in-line manufacturing are addressed. A simulation of the “high-voltage pulse source – electrode – dielectric coating – metal substrate” system has been conducted. Experimental studies have been conducted to evaluate the load capacity and voltage stability of the Corona 2.2 holiday detector using an improved generator at high capacitive loads.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.