Abstract

When the TBM passes through the weak and broken strata, it is easy to get stuck and be buried. Through the advance pre grouting engineering practice of TBM crossing fault zone in Qingdao area, the pre grouting reinforcement measures for preventing the occurrence of TBM card machine are explored, including grouting pressure, grouting drilling design, grouting material and other key parameters. The research results show that the surface pre grouting method is an effective grouting measure to prevent the occurrence of TBM stuck and buried accidents. Single cement slurry and C-S double slurry are used as grouting materials. The cement slurry is used to fill the void in soft broken stratum and C-S double slurry is used to improve the controllability of slurry diffusion. In the process of advanced pre-grouting construction on the ground surface, the application of progressive segmental grouting technology and membrane bag sealing grouting technology can effectively guarantee the strengthening range of soft ground and improve the effect of grouting reinforcement.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.