Abstract

Grouting is an effective method to enhance the bearing capacity of in-service pile foundations. The effect of optimizing grouting parameters for in-service pile foundation grouting reinforcement was verified through static load tests. The field tests of the pileless stratum show that the cement-sodium silicate slurry is more favourable for increasing the grouting pressure and more convenient to control the slurry diffusion than cement slurry. The grouting parameters of cement-sodium silicate slurry were determined according to the maximum grouting pressure and quantity. The slurry grouting parameters were cement slurry 1.6g/cm3 and cement slurry to sodium silicate ratio 2.29:1. Moreover, the effective range of segmental localized grouting reinforcement was detected by the resistivity method and in-situ standard penetration test, and the grouting position should be less than 2m from the side of the in-service pile foundation. Finally, it is found that pile side grouting can improve the bearing capacity of in-service pile foundation by 98% through static load test. The research results have reference value and guiding significance for the design and effect detection of pile foundation grouting reinforcement.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.