Abstract
This study considers generation and demand challenges of a 100% renewable UK electricity grid and how this could be addressed with interconnection or energy storage. Hourly demand and electricity generation profiles for a year have been constructed: Business as Usual (BAU) with a yearly demand of 540 TWh and Green Plus (GP) with a demand of 390 TWh, Two further scenarios based on the above have been considered with electrification of heating (ASHP) and electric vehicle transportation (EV). The resultant hourly imbalances have been used to calculate the interconnection and energy storage requirements. This paper discusses the findings of the BAU scenario. The calculated interconnector capacity required was found to be 60 GW and cost £58 billion. Energy storage capacity requirements vary depending on the selected technology. Rated capacity was estimated to be 14 GW with storage capacity of 3 TWh for pumped storage, 11 GW and 2.3 TWh for liquid air, and 65 GW and 13.6 TWh for hydrogen storage, at a cost of £65, £76 and £45 billion respectively. This paper indicates that storing hydrogen in underground caverns would offer the cheapest solution. However, whilst these technological solutions can address generation and demand imbalance in a fully renewable electricity grid, there clearly remain barriers to each technology.
Accepted Version (Free)
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.