Abstract
Morelos Park is part of the Municipal System of Tijuana Theme Parks (SIMPATT). Due to the multiple activities carried out for the community, as well as the lack of maintenance to the electrical installation, among other factors, the cost for electricity consumption is around $ 1,022,107.00 M.N. yearly. Objective: the purpose of this project is to carry out an energy efficiency study to obtain energy performance indicators (KPI) with which improvements for the rational and efficient use of energy can be proposed. Methodology: the project was worked with the collaboration of students in renewable energy engineering program internship. The study includes the following stages: 1) gathering energy data to determine the current state of electrical energy consumption; 2) analysis of the information obtained inorder to detect improvement areas; and 3) proposals for an efficient use of electrical energy. Contribution: with the development of this study, in addition to providing a viable economic benefit to the park administration, it contributes to the integration and application of tools and knowledge of future engineers in real environment situations.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.