Abstract
A new connection to an existing gas pipeline was made by hot-tapping, welding directly onto a pressurised pipeline. The welds were not post-weld heat treated, causing significant residual stresses. The critical weld had residual stresses determined by neutron diffraction using ANSTO's residual stress diffractometer, Kowari. The maximum measured residual stress (290 MPa) was 60% of the yield strength. The magnitudes of errors from a number of sources were estimated.An integrity assessment of the welded branch connection was performed with the measured residual stress values and with residual stress distributions from the BS 7910 and API 579 analysis codes. Analysis using estimates of residual stress from API 579 overestimated the critical crack size.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Pressure Vessels and Piping
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.