Abstract

Reasonable grid line engineering asset management is an important means for power companies to improve economic efficiency under the new electricity reform situation. Based on the whole-life-cycle theory, this paper puts into use the decommissioning of the whole process of cost perspective and analyses the line project construction to decommissioning and scrapping of the whole process of the cost. Through the calculation of the whole life cycle of the smallest annual cost, to determine the line economic life, the authors constructed the whole life cycle of a grid line project economic cost framework and put forward the best decommissioning time of a grid line model – that is, the economic life model. A case study was conducted based on a project example from a certain power grid company in China. The research results of this paper can be used to reduce the economic cost of operation and maintenance of power grid enterprises, improve the efficiency of input and output and provide reference suggestions for optimising the management of line engineering and other power assets of power grid companies.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call