Abstract
To ensure the construction safety of large foundation pit engineering (FPE) and optimise the data collection method, this paper applies sensors and automatic collection items to automatic data collection based on traditional manual measurement. Data processing and analysis are carried out through large FPE detection system construction. In the early-warning module, the improved grey model (1,1) – namely, the improved method G – is used to predict the settlement of buildings around the monitoring project, and its reliability is analysed. The improved method G has a good test result. Compared with method G and the autoregressive integrated moving average (Arima) model, the improved method G has a better prediction effect and a smaller prediction error. When compared with the mean absolute error of method G, that of the method used in the paper is smaller, which is −0.01. The root mean square value of the absolute error is smaller, which is 0.0.54 less than that of method G. Compared with the average relative error of the Arima model, that of the method used in this paper is 3.97%, which is 0.05% less than that. This method can be used to collect and predict data on large foundation pit construction sites, which is conducive to ensuring construction safety.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have