Abstract

AbstractThe indirect benefits of battery energy storage system (BESS) on the generation side participating in auxiliary service are hardly quantified in prior works. Nevertheless, the configuration of BESS could be affected by its indirect benefits. In this paper, the authors purpose a quantitative economic evaluation method of BESS considering the indirect benefits from the reduction in unit loss and the delay in investment. First, the authors complete further the cost model of BESS for frequency and peak regulation based on the whole life cycle theory. Second, the authors quantify the indirect benefits of BESS in thermal power plants based on the theory of rotor fatigue life loss and establish a benefits model that considers the unit loss reduction during frequency regulation and the delay in investment during peak regulation. Finally, the authors propose a set of indexes for economic evaluation of the thermal power plant with BESS. The simulation results show that the total benefits of BESS can be improved effectively by considering the indirect benefits from unit loss reduction and the delay in investment, proving the effectiveness of the proposed approach which can be meaningful for the future investment in BESS on the generation side.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call