Abstract
Shifting bottleneck (SB) algorithms have been successful in solving most real-sized scheduling problems. However, it is known that under certain conditions, solution quality degrades because of subproblem interactions. Changing the order in which subproblems are solved greatly affects the solution quality. We demonstrate that for some class of problems it is possible to induce production (IF–THEN) rules that determine the subproblem solution order and lead to good quality solutions, matching the performance of the SB algorithm in most other instances.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.