Abstract

We examine the performance of Shifting Bottleneck (SB) heuristics for shop scheduling problems where the performance measure to be minimized is makespan (C_{max}) or maximum lateness (L_{max}). Extensive computational experiments are conducted on benchmark problems from the literature as well as several thousand randomly generated test problems with three different routing structures and up to 1000 operations. Several different versions of SB are examined to determine the effect on solution quality and time of different subproblem solution procedures, reoptimization procedures and bottleneck selection criteria. Results show that the performance of SB is significantly affected by job routings, and that SB with optimal subproblem solutions and full reoptimization at each iteration consistently outperforms dispatching rules, but requires high computation times for large problems. High quality subproblem solutions and reoptimization procedures are essential to obtaining good solutions. We also show that schedules developed by SB to minimize L_{max} perform well with respect to several other performance measures, rendering them more attractive for practical use.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.