Abstract

This paper answers two fundamental questions concerning the usage of the shifting bottleneck (SB) procedure to optimize the criterion total weighted tardiness for the classical job shop scheduling problem. The first question is how to configure the SB procedure, as it is a divide-and-conquer method and consists of diverse subsolutions for each procedure phase. The second question is what the advantages of the SB procedure are, in comparison with other state-of-the-art approaches. To answer the first question, we evaluate the performance (i.e. the scheduling quality) and the efficiency (i.e. the computational time) of various SB variants using computational experiments and present guidelines for configuring the SB procedure. To respond to the second question, extensive computational experiments were conducted on various benchmark instances (up to 100 jobs $$\times $$× 20 machines). Results show the superior performance/efficiency trade-off of the SB variants with certain configuration to local search methods. This excellent trade-off between performance and efficiency makes the SB procedure particularly promising for solving practical production scheduling problems.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.