Abstract

Work activities on construction projects can experience disruptions caused by various things, one of the causes is the occurrence of work accidents. Identification and early analysis of potential hazards in each work packet, work methods, work activities, resources and environments in the WBS (Work Breakdown Structure) can prevent work accidents. Thus the need for WBS standardization is very important in presenting the assessment of risk, impact and frequency arising from workplace accidents. The purpose of this study was to develop a risk-based WBS standard for safety planning on dam construction. The results of this study are WBS standards, implementation methods, activities, potential hazard risks, safety planning using risk-based WBS standards, WBS dictionaries and WBS checklists on dam construction work, as an effort in preventing, reducing or eliminating the accident in dam construction work.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.