Abstract

Purpose: The purpose of this study is to reduce the level of work accidents in stadium construction by developing risk-based work breakdown structures. Methodology: The research methodology includes several stages, namely the literature study, analysis of data archives and previously related project and research, as well as through the validation of experts. Result: The results of this study are WBS standards, implementation methods, activities, resources, potential hazard risks and safety planning using risk-based WBS standards on stadium construction work, as a method in preventing, reducing, eliminating or even nulliying the chance of accident throughout the development of a construction work. Applications/Originality/Value: This research will hopefully provide benefits to the construction world by presenting work accidents prevention methods by incorporating risk elements into each level of project work in the Work Breakdown Structure which will be used as input in the making of a safety plan.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.