Abstract
Planning a modern open pit mine requires a computer model of the resources and reserves to be mined, both block and grid models. With current technological developments and has entered almost all sectors including the mining sector, as for computer program packages (software) used by the mining industry, namely Microsoft excel, Mincom minescap and others. An evaluation and analysis system of mine plans/ mine schedules is necessary to make predictions of mining operations that will be carried out and can be used to find the cause of deviation or design deviations. There are several weaknesses in making scheduling manually, so scheduling is done using SPRY which is very helpful in the scheduling process.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: MOTIVECTION : Journal of Mechanical, Electrical and Industrial Engineering
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.