Abstract

Integrated Optimization can find optimized solutions for a project to define open pit and mine scheduling with greater reliability. This work aims to demonstrate how the insertion of geometallurgical variables can significantly change the financial return of a project. Two geometallurgical variables are considered in mine planning simulations. Specific energy corresponds to the energy consumed in the comminution of the ore, and process recovery measures the percentage of metal incorporated into the product. Three scenarios were developed considering an iron ore deposit. In the Base Case (BC) scenario, the recovery was fixed, and the specific energy of comminution was not considered. GeoMet1 considers the variable recovery varying for each block. GeoMet2 considered both recovery and specific energy as variables varying for each block. GeoMet1 and GeoMet2 presented Net Present Value (NPV), respectively, as 3.68% and 13.57% lower than the BC. This overestimation of the BC results can be viewed as an optimistic case of mine planning that is very common in the mining industry. These results show that the use of specific energy and recovery variables is fundamental to obtaining more reliable mine planning.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call