Abstract

ABSTRACT An innovative scheme of induced caving by blasting was adopted in the depillaring continuous miner panel CM1 of Jhanjra Colliery of Eastern Coalfields Limited, a subsidiary of Coal India Limited. Initially, the blasting pattern was designed with respect to underground workings and later with respect to the surface, vertically above the panel, to facilitate effective caving. The natural caving was delayed due to the presence of three hard-rock beds of more than 5000 cavability index in the immediate roof of the R-VI seam in addition to the oversized left-out standing pillars kept during coal extraction in the panel, which provided extra supports to the hanging roof-rock in the goaf. To mitigate the situation, the design parameters were meticulously planned and implemented for successful blasting operations, which led to effective caving in the goaf and enabled successful extraction of the coal from the panel maintaining the required level of safety and productivity.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.