Abstract

This article relies on 66kV transmission line new construction design of Chifeng JingHua in the Inner Mongolian area, this paper discusses about the program of tower foundation in sandy slope terrain. Based on the original design method of steps foundation design, this paper provides a set of feasible design method, at the same time, by comparing with the design of the bored pile foundation, draw pile is more suitable for this project conclusion.