Abstract

A new integrated energy system (IES) has been proposed by combining the cooling, heating, and power generation (CCHP) system coupled with PV/T and compressed air energy storage (CAES). Based on the developed control operation strategy, rigorous system modeling and dynamic simulation are carried out by TRNSYS to determine the integrated operation effect of each subsystem. Energy utilization efficiency and annual value of costs were adopted to assess the benefits of the system. A building in Gansu Longnan area is selected as a study case. The study results show that the proposed system can meet the building load demand well. The PV efficiency and thermal efficiency are 0.17 and 0.19, respectively. The gas ratio of CAES storage tank is 0.94, which is safe and stable. In addition, the energy utilization is maximum when the internal combustion engine proportioning capacity is 30 % of the maximum heat load, which is 89.13 %. The annual value of the cost is 2.49 × 107 RMB during 40 years of operation.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.