Abstract

The electrical energy supplied by the Federal Electricity Commission (CFE) in Mexico suffers from disconnections due to failures due to overloads, short circuits or vandalism; leaving the user without this service for minutes or even for a few hours. Through the analysis by Quality Functions Deployment (QFD) we proceeded to the development of this work, the performance of a vertical position wind generator is designed and analyzed by software for the estimation of initial parameters, which due to its design Savonius multi-blade type makes it ideal for areas with very slow winds and speeds below 10 m/s. In order to meet the generation and energy saving needs, the implementation of a park of three vertical generators that will have the capacity to supply electrical energy to homes, offices or luminaries in public parks proposed. Finally, it is an opportunity to achieve one of the challenges set out in the 2030 sustainable development agenda and thereby guarantee one of the main objectives, which is universal access to energy services.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.