Abstract

When metro shield passes through existing operating lines, it is necessary to carry out automatic monitoring of existing lines. In this paper, taking the construction of Changsha Metro Line 4 under the shield of the existing Metro Line 2 as an example, the static level is set up in the construction affected area to monitor the vertical displacement of the track bed automatically. According to the actual situation of the site, a complete set of automatic monitoring system is designed, and a detailed site implementation scheme is formulated. Finally, the deformation data is analysed, and the characteristics of the whole system are summarized.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.