Abstract

When metro shield passes through existing operating lines, it is necessary to carry out automatic monitoring of existing lines. Taking Changsha Metro Line 4 shield tunnelling through existing Metro Line 2 as an example, this paper carries out automatic deformation monitoring of existing Metro and judges the influence of shield tunnelling on existing Metro. According to the actual situation of the field, a whole set of automatic monitoring system is designed, and the detailed implementation plan is worked out. Finally, the deformation data are analysed, and the characteristics of the whole system are summarized.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.