Abstract

Until a long-term solution is finalized, interim storage of sufficiently cooled spent nuclear fuel (SNF) assemblies in dry casks is the predominant practice. Since these dry casks can contain approximately 160 kg of reactor-grade plutonium, they require safeguards monitoring. Results of a simulation study conducted on the design development and analysis of a remote monitoring system (RMS) are presented. The goal of the study was to determine the suitability of this RMS to meet the SNF monitoring objectives. MCNP simulations of a dry cask with all its contents and a set of simulations with one or two removed SNF assemblies were performed to test the detection capabilities of the RMS. The removed assemblies were substituted with dummy assemblies to simulate concealment. The studies showed that the RMS design is suitable to monitor and detect the removal of even a single SNF assembly from the cask.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.