Abstract
AbstractCriteria and formulas are presented for scheduling cyclic pumping operations, to maintain a given minimum drawdown as required for drainage purposes. Keeping the total cycle length constant, the pumping periods are successively shortened and the shutoff periods lengthened. Solutions of the equation for the relative length of the shutoff periods are presented in a family of curves, which greatly simplifies the scheduling procedure.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have